Olympic Park London 2012

Olympic Park London 2012

Breaking records at the Olympics

Turfing The Olympic Stadium

Well who would you turn to after the jaw dropping spectacle of the London 2012 Opening Ceremony to get the surface ready for the Olympic Games? The task was formidable, within a 24 hour window after the opening ceremony, a surface suitable for the world’s best athletes was required.

Team Talbot

Talbot Landscapes (with 24 operatives) joined other specialist landscapers and our 3 custom built turf laying machines to re-turf the whole surface in a record breaking 12 hours.

Unfortunately there was little time for us to rest as we returned to the stadium less than a month later to repeat the whole process for the Paralympic Games at the end of August

An exhausting few weeks but we think the results speak for themselves.

Landscaping The Athlete’s Village

We worked alongside PJ Carey’s on the construction of the Athlete’s Village in Stratford (village-garden style district to house 24,000 athletes) on a 67 acre (20 hectares) site.

One of the most challenging aspects of the job was the altitude – since all materials and plants had to be crane lifted on to the podiums using specialist lifting equipment. Thankfully none of our team are afraid of heights.

 

Enquiry

We are interested in the projects that you are considering or currently working on.

We would love to hear from you

Share some of your project details with us here and we can bring our experience to help you fulfill your vision 

Case Studies

Derby Arboretum

Derby Arboretum

Talbot Landscapes are fortunate to have Derby City Council as a customer and have completed contracts in Derby Arboretum.

View Project...